| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Active BIM system for optimized multi-project ready-mix-concrete delivery
Authors:ID Begić, Hana (Author)
ID Galić, Mario (Author)
ID Klanšek, Uroš (Author)
Files:.pdf 10-1108_ecam-11-2022-1064.pdf (3,94 MB)
MD5: CDED1131E547C7204078FDD59A724312
 
URL https://www.emerald.com/insight/content/doi/10.1108/ecam-11-2022-1064/full/html
 
Language:English
Work type:Article
Typology:1.01 - Original Scientific Article
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:Purpose – Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery. Design/methodology/approach – The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures. Findings – The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants. Originality/value – The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.
Keywords:active building information modeling, BIM, internet of things, IoT, multi-project environment, optimization, ready-mix-concrete delivery, RMC
Publication status:Published
Publication version:Version of Record
Submitted for review:31.01.2023
Article acceptance date:23.05.2023
Publication date:01.01.2023
Publisher:Emerald Publishing
Year of publishing:2024
Number of pages: str. 5057-5084
Numbering:Vol. 31, no. 12
PID:20.500.12556/DKUM-90619 New window
UDC:005.8:69.05
ISSN on article:0969-9988
COBISS.SI-ID:181973763 New window
DOI:10.1108/ECAM-11-2022-1064 New window
Publication date in DKUM:11.09.2024
Views:32
Downloads:9
Metadata:XML DC-XML DC-RDF
Categories:Misc.
:
BEGIĆ, Hana, GALIĆ, Mario and KLANŠEK, Uroš, 2024, Active BIM system for optimized multi-project ready-mix-concrete delivery. Engineering construction and architectural management [online]. 2024. Vol. 31, no. 12, p. 5057–5084. [Accessed 4 April 2025]. DOI 10.1108/ECAM-11-2022-1064. Retrieved from: https://dk.um.si/IzpisGradiva.php?lang=eng&id=90619
Copy citation
  
Average score:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share


Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Record is a part of a journal

Title:Engineering construction and architectural management
Shortened title:Eng. constr. archit. manag.
Publisher:Blackwell Science
ISSN:0969-9988
COBISS.SI-ID:14455301 New window

Document is financed by a project

Funder:ARIS - Slovenian Research and Innovation Agency
Project number:P2-0129-2022
Name:Razvoj, modeliranje in optimiranje objektov in procesov v gradbeništvu in prometu

Licences

License:CC BY 4.0, Creative Commons Attribution 4.0 International
Link:http://creativecommons.org/licenses/by/4.0/
Description:This is the standard Creative Commons license that gives others maximum freedom to do what they want with the work as long as they credit the author.

Secondary language

Language:Slovenian
Keywords:aktivno informacijsko modeliranje stavb, internet stvari, večprojektno okolje, optimizacija, dostava gotovega betona


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica