| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Primerjava sistemov medetažnih konstrukcij s stroškovno in časovno analizo
Authors:ID Čontala, Dejan (Author)
ID Štrukelj, Andrej (Mentor) More about this mentor... New window
ID Pučko, Zoran (Comentor)
Files:.pdf VS_Contala_Dejan_2018.pdf (3,32 MB)
MD5: CB3412AAA8F667AF8A5BE9D1B2112736
PID: 20.500.12556/dkum/e2e4091e-bae9-4ace-b905-9ee3faf31401
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:V diplomskem delu smo obravnavali tri variante medetažnih konstrukcij. Vrst stropnih sistemov je dandanes veliko, zato smo izbrali tri najpogostejše variante. Med seboj smo primerjali sistem AB plošče, stropni sistem Porotherm podjetja Wienerberger Opekarna Ormož d.o.o. in stropni sistem Ytong podjetja Xella porobeton SI. Vsak stropni sistem smo podrobneje predstavili, opisali njegovo tehnologijo izvedbe ter izdelali stroškovno in časovno analizo. Pred izvedbo samih analiz smo najprej opisali teoretične osnove stroškovne in časovne analize. V nadaljevanju smo izdelali popis del, predkalkulacije in izvedli kalkulacijo glavne analize cene za enoto mere. S pomočjo glavne analize cene smo izračunali stroške posameznega stropnega sistema. Na podlagi popisa del smo za vsako aktivnost izračunali čas trajanja in tako izvedli časovno analizo s pomočjo programa MS Project. Aktivnostim smo še dodali vire in za vsak stropni sistem izdelali gantogram. Na podlagi pridobljenih rezultatov smo določili stroškovno in časovno najugodnejšo varianto stropnega sistema.
Keywords:gradbeništvo, stropni sistemi, stroškovna analiza, časovna analiza
Place of publishing:Maribor
Publisher:[D. Čontala]
Year of publishing:2018
PID:20.500.12556/DKUM-72459 New window
UDC:692.54+657.478(043.2)
COBISS.SI-ID:21972758 New window
NUK URN:URN:SI:UM:DK:YQGTDKCB
Publication date in DKUM:09.11.2018
Views:1533
Downloads:116
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
ČONTALA, Dejan, 2018, Primerjava sistemov medetažnih konstrukcij s stroškovno in časovno analizo [online]. Bachelor’s thesis. Maribor : D. Čontala. [Accessed 2 April 2025]. Retrieved from: https://dk.um.si/IzpisGradiva.php?lang=eng&id=72459
Copy citation
  
Average score:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share



Similar works from other repositories:

No similar works found

Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:26.09.2018

Secondary language

Language:English
Title:The comparison of floor systems with time and cost analysis
Abstract:In the graduation thesis, we have dealt with three variants of split-level constructions. Nowadays, there are many types of ceiling systems. Thus, we have chosen the three most common variants. We have compared the system of AB plates, ceiling system Porotherm of the company Wienerberger Opekarna Ormož d.o.o., and ceiling system Ytong of the company Xella porobeton SI. Each of the ceiling system has been presented in detail; we have described its implementation technology, and made cost and time analysis. Prior performing analyses, we first described the theoretical basics of cost and time analysis. Further, we have prepared a list of works, pre-calculations, and performed calculation of the main price analysis for the unit of measure. On the basis of the main price analysis, we have calculated costs of individual ceiling system. Based on the list of works, we have calculated duration for each activity and thus implemented time analysis using the MS Project programme. We have added resources to the activities, and created Gantt chart for each ceiling system. Based on the obtained results, we have determined the most favourable variant of the ceiling system regarding costs and time.
Keywords:civil engineering, floor systems, cost analysis, time analysis


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica