Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
|
|
SLO
|
ENG
|
Cookies and privacy
DKUM
EPF - Faculty of Business and Economics
FE - Faculty of Energy Technology
FERI - Faculty of Electrical Engineering and Computer Science
FF - Faculty of Arts
FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
FKBV - Faculty of Agriculture and Life Sciences
FKKT - Faculty of Chemistry and Chemical Engineering
FL - Faculty of Logistic
FNM - Faculty of Natural Sciences and Mathematics
FOV - Faculty of Organizational Sciences in Kranj
FS - Faculty of Mechanical Engineering
FT - Faculty of Tourism
FVV - Faculty of Criminal Justice and Security
FZV - Faculty of Health Sciences
MF - Faculty of Medicine
PEF - Faculty of Education
PF - Faculty of Law
UKM - University of Maribor Library
UM - University of Maribor
UZUM - University of Maribor Press
COBISS
Faculty of Business and Economic, Maribor
Faculty of Agriculture and Life Sciences, Maribor
Faculty of Logistics, Celje, Krško
Faculty of Organizational Sciences, Kranj
Faculty of Criminal Justice and Security, Ljubljana
Faculty of Health Sciences
Library of Technical Faculties, Maribor
Faculty of Medicine, Maribor
Miklošič Library FPNM, Maribor
Faculty of Law, Maribor
University of Maribor Library
Bigger font
|
Smaller font
Introduction
Search
Browsing
Upload document
For students
For employees
Statistics
Login
First page
>
Show document
Show document
Title:
Primerjava sistemov medetažnih konstrukcij s stroškovno in časovno analizo
Authors:
ID
Čontala, Dejan
(Author)
ID
Štrukelj, Andrej
(Mentor)
More about this mentor...
ID
Pučko, Zoran
(Comentor)
Files:
VS_Contala_Dejan_2018.pdf
(3,32 MB)
MD5: CB3412AAA8F667AF8A5BE9D1B2112736
PID:
20.500.12556/dkum/e2e4091e-bae9-4ace-b905-9ee3faf31401
Language:
Slovenian
Work type:
Bachelor thesis/paper
Typology:
2.11 - Undergraduate Thesis
Organization:
FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:
V diplomskem delu smo obravnavali tri variante medetažnih konstrukcij. Vrst stropnih sistemov je dandanes veliko, zato smo izbrali tri najpogostejše variante. Med seboj smo primerjali sistem AB plošče, stropni sistem Porotherm podjetja Wienerberger Opekarna Ormož d.o.o. in stropni sistem Ytong podjetja Xella porobeton SI. Vsak stropni sistem smo podrobneje predstavili, opisali njegovo tehnologijo izvedbe ter izdelali stroškovno in časovno analizo. Pred izvedbo samih analiz smo najprej opisali teoretične osnove stroškovne in časovne analize. V nadaljevanju smo izdelali popis del, predkalkulacije in izvedli kalkulacijo glavne analize cene za enoto mere. S pomočjo glavne analize cene smo izračunali stroške posameznega stropnega sistema. Na podlagi popisa del smo za vsako aktivnost izračunali čas trajanja in tako izvedli časovno analizo s pomočjo programa MS Project. Aktivnostim smo še dodali vire in za vsak stropni sistem izdelali gantogram. Na podlagi pridobljenih rezultatov smo določili stroškovno in časovno najugodnejšo varianto stropnega sistema.
Keywords:
gradbeništvo
,
stropni sistemi
,
stroškovna analiza
,
časovna analiza
Place of publishing:
Maribor
Publisher:
[D. Čontala]
Year of publishing:
2018
PID:
20.500.12556/DKUM-72459
UDC:
692.54+657.478(043.2)
COBISS.SI-ID:
21972758
NUK URN:
URN:SI:UM:DK:YQGTDKCB
Publication date in DKUM:
09.11.2018
Views:
1533
Downloads:
116
Metadata:
Categories:
KTFMB - FG
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
ČONTALA, Dejan, 2018,
Primerjava sistemov medetažnih konstrukcij s stroškovno in časovno analizo
[online]. Bachelor’s thesis. Maribor : D. Čontala. [Accessed 2 April 2025]. Retrieved from: https://dk.um.si/IzpisGradiva.php?lang=eng&id=72459
Copy citation
Average score:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
(0 votes)
Your score:
Voting is allowed only for
logged in
users.
Share:
Similar works from our repository:
Preventiva raka materničnega vratu v Sloveniji
Predgovor
Triaža žensk s pozitivnim izvidom presejalnega testa HPV s citološkim pregledom brisa materničnega vratu
Raziskovalni projekt sprejemljivosti testa HPV doma med neodzivnicami DP Zora in učinkovitosti novih triažnih testov
Raziskovalni projekt sprejemljivosti testa HPV doma med neodzivnicami DP Zora in učinkovitosti novih triažnih testov
Similar works from other repositories:
No similar works found
Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.
Licences
License:
CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:
http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:
The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:
26.09.2018
Secondary language
Language:
English
Title:
The comparison of floor systems with time and cost analysis
Abstract:
In the graduation thesis, we have dealt with three variants of split-level constructions. Nowadays, there are many types of ceiling systems. Thus, we have chosen the three most common variants. We have compared the system of AB plates, ceiling system Porotherm of the company Wienerberger Opekarna Ormož d.o.o., and ceiling system Ytong of the company Xella porobeton SI. Each of the ceiling system has been presented in detail; we have described its implementation technology, and made cost and time analysis. Prior performing analyses, we first described the theoretical basics of cost and time analysis. Further, we have prepared a list of works, pre-calculations, and performed calculation of the main price analysis for the unit of measure. On the basis of the main price analysis, we have calculated costs of individual ceiling system. Based on the list of works, we have calculated duration for each activity and thus implemented time analysis using the MS Project programme. We have added resources to the activities, and created Gantt chart for each ceiling system. Based on the obtained results, we have determined the most favourable variant of the ceiling system regarding costs and time.
Keywords:
civil engineering
,
floor systems
,
cost analysis
,
time analysis