| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Celostno informacijsko modeliranje projekta za izgradnjo kanalizacijskega sistema v Krškem
Authors:ID Pirc, Alenka (Author)
ID Šuman, Nataša (Mentor) More about this mentor... New window
ID Pučko, Zoran (Comentor)
Files:.pdf MAG_Pirc_Alenka_2017.pdf (8,04 MB)
MD5: D8152DFBC7E11E2192336E06A0E854BB
PID: 20.500.12556/dkum/676b46b3-15f9-4506-9ce1-cd34126518b4
 
Language:Slovenian
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:BIM pristop h graditvi je vse bolj razširjen v svetu in v Sloveniji predvsem v visokih gradnjah, gradnjah mostov in cest, veliko manj pa pri gradnji kanalizacijskih sistemov. Zato v magistrskem delu obravnavamo 3D, 4D in 5D informacijsko modeliranje projekta (ang. Building Information Modeling – BIM) in način operativnega vodenja projekta na primeru izgradnje kanalizacijskega sistema v občini Krško. Končni rezultat dela je izdelan 3D BIM model v programu Urbano, izvožen v program 4BUILD, kjer je nadgrajen v 4D in 5D BIM model. Na izdelanem modelu je nato informativno prikazana možnost uporabe programa za operativno vodenje aktivnosti na gradbišču. V ta namen smo v teoretičnem delu magistrskega dela podali teoretične osnove o informacijskem modeliranju, razširjenosti uporabe po svetu in v Sloveniji ter pri načrtovanju infrastrukturnih projektov. Prav tako smo predstavili strokovno literaturo o stroškovnem in terminskem planiranju ter o vodenju projekta v fazi gradnje objekta. V aplikativnem delu smo na podlagi projekta za izvedbo s programsko opremo Urbano in 4BUILD izdelali 3D, 4D in 5D BIM model kanalizacijskega sistema v Krškem. V programu 4BUILD smo tudi prikazali uporabnost pri vodenju gradbiščne dokumentacije. V diskusiji in zaključku smo strnili povzetek procesa, prednosti in pomanjkljivosti, ki smo jih opazili tekom informacijskega modeliranja BIM modela.
Keywords:informacijsko modeliranje objekta (BIM), kanalizacijski sistem, 3D BIM model, 4D BIM model, 5D BIM model, operativno vodenje projekta
Place of publishing:Maribor
Publisher:[A. Pirc]
Year of publishing:2017
PID:20.500.12556/DKUM-68040 New window
UDC:004:628.24(043.2)
COBISS.SI-ID:20952598 New window
NUK URN:URN:SI:UM:DK:X2S2UEGS
Publication date in DKUM:25.09.2017
Views:1516
Downloads:194
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
PIRC, Alenka, 2017, Celostno informacijsko modeliranje projekta za izgradnjo kanalizacijskega sistema v Krškem [online]. Master’s thesis. Maribor : A. Pirc. [Accessed 12 April 2025]. Retrieved from: https://dk.um.si/IzpisGradiva.php?lang=eng&id=68040
Copy citation
  
Average score:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share


Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:06.09.2017

Secondary language

Language:English
Title:Comprehensive information modeling for a construction project of the sewage system in Krško
Abstract:The BIM approach to construction is increasingly wide spreading in the world and in Slovenia, especially in high rise buildings, bridges and road construction, but much less in the construction of sewage systems, with which we deal with in the master thesis, therefore our master thesis deals with the 3D, 4D and 5D building information modeling (BIM) and the operational management methods for a construction project of the sewage system in the municipality of Krško. The final result of the master thesis is the 3D BIM model created in the Urbano software, exported to the 4BUILD software where is upgraded to the 4D BIM model and to 5D BIM model. The model is then used for demonstrating the possibilities that 4BUILD software is providing for the operational management of construction site. Therefor in the theoretical part of the master thesis we are presenting the theoretical basics of building information modeling, the widespread use in the world, in Slovenia and in the process of planning infrastructure projects. We are also presenting literature about cost and time planning and the management of the project during the construction phase of the building. In the application part of our master thesis we created 3D, 4D and 5D BIM models of a sewage system in Krško in Urbano and 4BUILD softwares that support BIM process. In the 4BUILD software we also demonstrated the usefulness for managing the construction site documentation. In the discussion and conclusion, we summarized the process and presented the advantages and disadvantages that were identified during the information modeling of the BIM model.
Keywords:Building information modeling (BIM), sewage system, 3D BIM model, 4D BIM model, 5D BIM model, operational management of the project


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica