Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
|
|
SLO
|
ENG
|
Cookies and privacy
DKUM
EPF - Faculty of Business and Economics
FE - Faculty of Energy Technology
FERI - Faculty of Electrical Engineering and Computer Science
FF - Faculty of Arts
FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
FKBV - Faculty of Agriculture and Life Sciences
FKKT - Faculty of Chemistry and Chemical Engineering
FL - Faculty of Logistic
FNM - Faculty of Natural Sciences and Mathematics
FOV - Faculty of Organizational Sciences in Kranj
FS - Faculty of Mechanical Engineering
FT - Faculty of Tourism
FVV - Faculty of Criminal Justice and Security
FZV - Faculty of Health Sciences
MF - Faculty of Medicine
PEF - Faculty of Education
PF - Faculty of Law
UKM - University of Maribor Library
UM - University of Maribor
UZUM - University of Maribor Press
COBISS
Faculty of Business and Economic, Maribor
Faculty of Agriculture and Life Sciences, Maribor
Faculty of Logistics, Celje, Krško
Faculty of Organizational Sciences, Kranj
Faculty of Criminal Justice and Security, Ljubljana
Faculty of Health Sciences
Library of Technical Faculties, Maribor
Faculty of Medicine, Maribor
Miklošič Library FPNM, Maribor
Faculty of Law, Maribor
University of Maribor Library
Bigger font
|
Smaller font
Introduction
Search
Browsing
Upload document
For students
For employees
Statistics
Login
First page
>
Show document
Show document
Title:
Uvajanje nove proizvodne linije za izdelavo komponente avtomobilske polgredi
Authors:
ID
Fridrih, Matej
(Author)
ID
Buchmeister, Borut
(Mentor)
More about this mentor...
Files:
VS_Fridrih_Matej_2015.pdf
(3,72 MB)
MD5: C387E5BA570B742A9F1A5259B132CCDD
Language:
Slovenian
Work type:
Bachelor thesis/paper
Typology:
2.11 - Undergraduate Thesis
Organization:
FS - Faculty of Mechanical Engineering
Abstract:
Pri uvajanju nove proizvodne linije se srečamo s številnimi organizacijskimi problemi. Pojavi se vprašanje, kako bomo postavili novo linijo, kakšne bodo naše kapacitete in ali bodo stroji zadostili našim pričakovanjem. V okviru diplomske naloge sem predstavil novo proizvodno linijo ČEP 6 in stroje v podjetju GKN Driveline Slovenija. Poudarek diplomskega dela je bil na načrtovanju preventivnega vzdrževanja strojev in opreme, njihovem uvajanju ter postavitvi le-teh na proizvodni liniji. Med fazo postavljanja proizvodne linije sem vključil veliko metod vitkega podjetja, katerih rezultati so racionalnejša in kakovostna proizvodnja. Te metode so Celovito produktivno vzdrževanje (TPM), Samostojno vzdrževanje (AM), Kaizen, Standardno delo (SW) in metoda 5s. S ciljem lažjega nadzora vzdrževanja so bila izdelana potrebna navodila in obrazci, ki bodo delavcem lajšali nadzor ter omogočili večji izkoristek proizvodne linije. Proces na liniji ČEP 6 bo v veliki meri avtomatiziran, kar bo pripomoglo k povečanju produktivnosti in nižjim stroškom procesa.
Keywords:
Uvajanje proizvodne linije
,
vzdrževanje
,
nadzor
,
avtomobilska polgred
Place of publishing:
Maribor
Publisher:
[M. Fridrih]
Year of publishing:
2015
PID:
20.500.12556/DKUM-54054
UDC:
658.51:629.3(043.2)
COBISS.SI-ID:
19142422
NUK URN:
URN:SI:UM:DK:EYVKZHQZ
Publication date in DKUM:
27.10.2015
Views:
1633
Downloads:
223
Metadata:
Categories:
KTFMB - FS
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
FRIDRIH, Matej, 2015,
Uvajanje nove proizvodne linije za izdelavo komponente avtomobilske polgredi
[online]. Bachelor’s thesis. Maribor : M. Fridrih. [Accessed 31 March 2025]. Retrieved from: https://dk.um.si/IzpisGradiva.php?lang=eng&id=54054
Copy citation
Average score:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
(0 votes)
Your score:
Voting is allowed only for
logged in
users.
Share:
Similar works from our repository:
Negovalni problemi pacientk s sindromom hiperstimulacije jajčnikov
Osveščenost ljudi o pravicah do paliativne oskrbe
Zdravstvena nega pacienta z nazogastrično sondo
Vloga medicinske sestre po resekciji želodca
Urgenca "Duševne motnje"
Similar works from other repositories:
Incombustible materials for protection against fire
Workplace safety in smaller concrete plant
COVID-19 pandemic and personal protective equipment in healthcare
Decontamination in a chemical incident
Personal protective equipment and information technology (I.T)
Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.
Secondary language
Language:
English
Title:
Introduction of new production line for making car component sideshaft
Abstract:
When we introduce a new production line, we meet many problems with organizational character. The question arises how to set up a new line, what will be our capacity and while the machines meet our expectations. I presented a new production line and single machines in the company GKN Driveline Slovenija. I focused on the planning preventive maintenance of machinery and equipment, and installation of them selves on the production line. During the phase of production lines I have included many methods of lean enterprise, the results of which are rational and quality production. All this I connected through various methods, such as Total productive maintenance (TPM), Lean Enterprise, autonome maintenance (AM), kaizen and method 5s. With a view to facilitating supervision of maintenance have been made necessary instructions and forms, which will be facilitated for workers control and allow greater utilization of production lines. The process on line ČEP 6 will be largely automated, which will help to increase productivity and lower the cost of the process.
Keywords:
Introduction of production line
,
maintenance
,
control
,
car sideshaft
Comments
Leave comment
You must
log in
to leave a comment.
Comments (0)
0 - 0 / 0
There are no comments!
Back