Your browser does not allow JavaScript!
JavaScript is necessary for the proper functioning of this website. Please enable JavaScript or use a modern browser.
|
|
SLO
|
ENG
|
Cookies and privacy
DKUM
EPF - Faculty of Business and Economics
FE - Faculty of Energy Technology
FERI - Faculty of Electrical Engineering and Computer Science
FF - Faculty of Arts
FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
FKBV - Faculty of Agriculture and Life Sciences
FKKT - Faculty of Chemistry and Chemical Engineering
FL - Faculty of Logistic
FNM - Faculty of Natural Sciences and Mathematics
FOV - Faculty of Organizational Sciences in Kranj
FS - Faculty of Mechanical Engineering
FT - Faculty of Tourism
FVV - Faculty of Criminal Justice and Security
FZV - Faculty of Health Sciences
MF - Faculty of Medicine
PEF - Faculty of Education
PF - Faculty of Law
UKM - University of Maribor Library
UM - University of Maribor
UZUM - University of Maribor Press
COBISS
Faculty of Business and Economic, Maribor
Faculty of Agriculture and Life Sciences, Maribor
Faculty of Logistics, Celje, Krško
Faculty of Organizational Sciences, Kranj
Faculty of Criminal Justice and Security, Ljubljana
Faculty of Health Sciences
Library of Technical Faculties, Maribor
Faculty of Medicine, Maribor
Miklošič Library FPNM, Maribor
Faculty of Law, Maribor
University of Maribor Library
Bigger font
|
Smaller font
Introduction
Search
Browsing
Upload document
For students
For employees
Statistics
Login
First page
>
Show document
Show document
Title:
Prenovitev proizvodne linije sira v podjetju Mlekarna Celeia, d.o.o.
Authors:
ID
Prislan, Tomaž
(Author)
ID
Gajšek, Brigita
(Mentor)
More about this mentor...
Files:
VS_Prislan_Tomaz_2015.pdf
(1,49 MB)
MD5: 45542BF980450F14E9879F75FAD71572
Language:
Slovenian
Work type:
Bachelor thesis/paper
Organization:
FL - Faculty of Logistic
Abstract:
Na začetku diplomskega dela predstavimo problem ročne manipulacije, križanja transportnih poti, postopka obdelave, kontaminacije. V nadaljevanju predstavimo rešitve za odpravo problemov in način za prenovo proizvodnje. Glavni del začnemo z obstoječim stanjem in podrobneje predstavimo oddelek proizvodnje, ki smo ga izbrali za glavno temo. Predstavimo delovni prostor s posameznimi oddelki obdelave, opišemo potek dela na oddelkih, nato pa sledita celoten opis procesa od začetka do konca in kritična analiza predstavljenega procesa. Kot najbolj ekonomični rešitvi sta se izkazali prenovitev in avtomatizacija proizvodne linije. Prenovitev in avtomatizacijo smo dosegli z novim transportnim sistemom, s strojem za rezanje, z vakuumskim pakirnim strojem, s pakirnim strojem s komoro za krčenje, samodejnim sušilecm in s pakirnim strojem. Predstavimo delovanje prenovljenega proizvodnega procesa ter primerjamo razlike v količini izgub, času, številu delavcev in v prihranku, kar predstavlja veliko večjo učinkovitost. V sklepnem delu predstavimo finančne in infrastrukturne pogoje, potrebne za izvršitev prenove z možnostjo nadaljnjega razvoja.
Keywords:
prenova
,
proizvodnja
,
logistika
,
transportni sistem
,
pakiranje
,
avtomatizacija
Place of publishing:
Celje
Publisher:
[T. Prislan]
Year of publishing:
2015
PID:
20.500.12556/DKUM-48058
UDC:
338
COBISS.SI-ID:
512696637
NUK URN:
URN:SI:UM:DK:DHKXUHNE
Publication date in DKUM:
07.09.2015
Views:
1490
Downloads:
153
Metadata:
Categories:
FL
Cite this work
Plain text
BibTeX
EndNote XML
EndNote/Refer
RIS
ABNT
ACM Ref
AMA
APA
Chicago 17th Author-Date
Harvard
IEEE
ISO 690
MLA
Vancouver
:
PRISLAN, Tomaž, 2015,
Prenovitev proizvodne linije sira v podjetju Mlekarna Celeia, d.o.o.
[online]. Bachelor’s thesis. Celje : T. Prislan. [Accessed 1 April 2025]. Retrieved from: https://dk.um.si/IzpisGradiva.php?lang=eng&id=48058
Copy citation
Average score:
0.5
1
1.5
2
2.5
3
3.5
4
4.5
5
(0 votes)
Your score:
Voting is allowed only for
logged in
users.
Share:
Similar works from our repository:
Final report on the RIS Intership implementation
Evaluation of locally available amorphous waste materials as a source for alternative alkali activators
RILEM TC 247-DTA round robin test
The deformation of alkali-activated materials at different curing temperatures
Optimization and mechanical-physical characterization of geopolymers with construction and demolition waste (CDW) aggregates for construction products
Similar works from other repositories:
Vrednotenje inovativnih fasadnih panelov z zaključnim slojem iz alkalijsko aktiviranih industrijskih in gradbenih odpadkov
Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.
Secondary language
Language:
English
Title:
Renovation of the cheese production line in the company Celeia Dairy Ltd.
Abstract:
In the introduction of the thesis, the problems of manual manipulation, the crossing of transport routes, the processing operation, and contamination are discussed. Then, the solutions how to overcome these problems are presented as well as the proposed way for the renewal of production. In the main part of the thesis, the author of the thesis describes the status quo and then depicts the production department which consitutes the main research question. Furthermore, the working space and the workflow of the individual departments are described. This is followed by a full description of the process from beginning to the very underpinned by a comprehensive critical analysis of the presented process. The most economical solution has proven to be the renovation and automation of the production lines. The renovation and automation have been achived by a new conveyor system, a machine for cutting, a vacuum packing machine, a packing machine with the chamber for contraction, an auto-dryer and a packing machine. The renewed operation of the production process is presented and the differences in the amount of the losses, time, the number of workers and savings which represent a much higher efficiency are compared. In the final part, the financial and infrastructural conditions necessary for the execution of the renovation, with the possibility for further development, are discussed.
Keywords:
renovation
,
production
,
logistics
,
transport system
,
packing
,
automation
Comments
Leave comment
You must
log in
to leave a comment.
Comments (0)
0 - 0 / 0
There are no comments!
Back