Title:Organizacija gradbišča in terminsko planiranje gradnje hotela A v Žalcu : diplomsko delo
Authors:ID Knez, Jan (Author)
ID Klanšek, Uroš (Mentor) More about this mentor... New window
ID Pučko, Zoran (Comentor)
Files:.pdf VS_Knez_Jan_2023.pdf (2,13 MB)
MD5: C06D657B343F4D99C5A75AC9D8AE38E6
 
.zip VS_Knez_Jan_2023.zip (246,99 KB)
MD5: D58260369B033706995031A58CD74571
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Abstract:V diplomskem delu je obravnavana organizacija gradbišča in terminsko planiranje Hotela A v Žalcu. Najprej je predstavljen splošni opis objekta (lokacija, funkcionalna zasnova, velikost in tlaki prostorov v posameznih nadstropjih idr.). Sledi opis konstrukcije in njena obdelava, kakšni materiali bodo vgrajeni in njihove dimenzije. Zajeti so tudi komunali priključki in kako jih pravilno izvesti. Organizacija gradbišča se prične s predhodnim proučevanjem pogojev gradnje objekta. Prikazane so dolžnosti investitorja in izvajalca, proučevanje lokacijske informacije, vplivov objekta na okolico in preskrba gradbišča s potrebnimi materiali. Predstavljeni so tudi tehnološki procesi grajenja za predvideni projekt, ureditev gradbišča, dimenzioniranje in postavitev začasnih objektov ter začasnih priključkov, ki so potrebni za normalno obratovanje gradbišča. Zadnji del zajema terminsko planiranje, kjer so prikazane logično in racionalno razporejene aktivnosti na gradbišču. Opisane so aktivnosti, ki se bodo izvajale v fazi gradnje objekta in so prikazane v gantogramu, kjer so razvidni začetek, konec in dolžina trajanja posamezne aktivnosti ter medsebojne povezave. Na koncu bomo dobili skupno število dni, potrebnih od začetka do končanja vseh del na objektu, ki morajo biti izvedena v pogodbenem roku.
Keywords:gradbeništvo, organizacija gradbišča, terminsko planiranje
Place of publishing:Maribor
Place of performance:Maribor
Publisher:[J. Knez]
Year of publishing:2023
Number of pages:1 spletni vir (1 datoteka PDF (XII, 86 f.))
PID:20.500.12556/DKUM-84647-2cf9c71e-0eef-de55-8c53-2bd2af0cce93 New window
UDC:69.05(043.2)
COBISS.SI-ID:171739907 New window
Publication date in DKUM:02.11.2023
Views:577
Downloads:93
Metadata:XML DC-XML DC-RDF
Categories:KTFMB - FG
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share


Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:03.07.2023

Secondary language

Language:English
Title:Construction site organization and building time scheduling for hotel A in Žalec
Abstract:The thesis addresses the construction site organisation and building time scheduling for Hotel A in Žalec. First, the author provides a general description of the facility (location, functional design, size and flooring in individual storeys etc.). Next, the thesis describes the structure and its finishing, the materials that are to be installed and their dimensions. This includes the public utility connections and how to execute them in the correct manner. Construction site organisation begins with a preliminary inspection of the conditions for the construction of the facility. The thesis examines the obligations of the investor and the contractor, review of the site plan information, the environmental impacts of the building and the supply of the necessary materials to the construction site. Furthermore, the thesis presents the technological processes of the construction of the facility, the arrangement of the construction site, dimensioning and the implementation of temporary facilities and temporary connections, necessary for normal operation of the construction site. The final part of the thesis includes building time scheduling, which illustrates the logically and rationally distributed activities at the construction site. The activities that will be carried out during the construction stage are described and demonstrated in a Gantt chart, illustrating the beginning, the end and the duration of each activity and the precedence relationships between these activities. Finally, we will get the total number of days required from the beginning to the end of all the works on the site, which must be carried out within the contract’s deadline.
Keywords:construction, construction site organization, scheduling


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica