Title:Uporaba metod mrežnega planiranja na primeru novogradnje hleva za govedo
Authors:ID Kep, Tina (Author)
ID Pažek, Karmen (Mentor) More about this mentor... New window
Files:.pdf MAG_Kep_Tina_2021.pdf (1,51 MB)
MD5: F28D712EA0F6F829737BC96BEB3394AD
PID: 20.500.12556/dkum/a245f96b-cf9c-473a-b2d9-c17c02601e4c
 
Language:Slovenian
Work type:Master's thesis/paper
Typology:2.09 - Master's Thesis
Organization:FKBV - Faculty of Agriculture and Life Sciences
Abstract:Pri vodenju, nadzoru in načrtovanju projektov so nam v veliko pomoč metode mrežnega planiranja. Najpogosteje uporabljeni metodi sta metoda kritične poti (CPM – critical path method) ter tehnika vrednotenja in pregleda projekta (PERT – program evaluation and review technique). Namen magistrskega dela je bil oceniti število dni trajanja projekta gradnje hleva za govedo s pomočjo postopka mrežnega planiranja. Hkrati smo spremljali celoten postopek in čas trajanja gradnje hleva na kmetiji. Dobljene vrednosti o trajanju gradnje smo primerjali s predhodno ocenjenim časom, potrebnim za gradnjo hleva. Najprej smo sestavili seznam dejavnosti z oznakami, predhodnimi dejavnostmi in časi trajanja za projekt, ki nam je bil dokaj nepoznan. S pomočjo tega smo izračunali najzgodnejši in najpoznejši rok dokončanja gradnje. Sledil je izris mrežnega diagrama in gantograma. Določili smo vse možne poti in izračunali kritično pot, ki z metodo CPM za naš projekt znaša 131 dni. Kritična pot je tudi najdaljša pot v projektu. Gradnja bi trajala 148 dni, s 95-odstotno verjetnostjo ocene po metodi PERT pa največ 125,45 dneva. S pomočjo metod mrežnega planiranja si lahko, tudi če primera ne poznamo, dobro pomagamo s planom dela. Priporočljivo je poznati projekt, saj lahko tako najbolje določimo čas trajanja ter morebitne zakasnitve in zamude pri izvedbi.
Keywords:mrežno planiranje, CPM, PERT, hlev za govedo
Place of publishing:Maribor
Year of publishing:2021
PID:20.500.12556/DKUM-80588 New window
COBISS.SI-ID:79242243 New window
Publication date in DKUM:06.10.2021
Views:1092
Downloads:142
Metadata:XML DC-XML DC-RDF
Categories:FKBV
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share


Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:21.09.2021

Secondary language

Language:English
Title:Use of network planning methods on a case of cattle stall construction
Abstract:Network planning methods are very helpful in project management, control and planning. The most commonly used tools are the critical path method (CPM) and the program evaluation and review technique (PERT). The purpose of the thesis was to estimate the number of days required for the cattle stall construction via network planning, and at the same time, the entire process and the duration of the construction of the stable at the farm were monitored. The resulting duration values of construction were compared with the previously estimated time required to build the cattle stall. First, a list of activities with labels and previous activities and duration periods was drawn up for the project, which was quite unknown. This is used to calculate the earliest and latest shelf life. A grid diagram and Gantt chart followed. All possible routes were identified and the critical route calculated, which is 131 days for our project, using the CPM method. The critical route is also the longest route in the project. The construction took place for 148 days. With a 95% probability of a maximum of 125.45 days, for the PERT method. With the help of network planning methods, even the case is unknown, the work plan can be helpful. However, it is advisable to know the project, as this is the only way to best define the duration and possible delays in implementation.
Keywords:network planning, CPM, PERT, cattle stall


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica