| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:Primerjalna analiza ddom in hierarhičnega koncepta planiranja proizvodnje
Authors:ID Rupnik, Inka (Author)
ID Roblek, Matjaž (Mentor) More about this mentor... New window
Files:.pdf UN_Rupnik_Inka_2021.pdf (2,16 MB)
MD5: A574F844F035D63C43EC95CB354C89E5
PID: 20.500.12556/dkum/c17f82c7-1314-4e38-b244-2bff2f0ea291
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FOV - Faculty of Organizational Sciences in Kranj
Abstract:Problem: Klasičen sistem planiranja proizvodnje, v literaturi prepoznan tudi kot model hierahičnega planiranja proizvodnje ali MRP II (Manufacturing resource planning) ali koncept MRP/CRP (Material / Capacity requirements planning) ali klasični MRP, nam ne omogoča optimalnega planiranja in natančnega pregleda zalog, ker modul MRP ne upošteva operacij, ki so v teku. Pri klasičnem planiranju MRP naročila niso zaključena ob pravem času, kajti pretok informacij in podatkov je prepočasen. Namen: Namen diplomske naloge je narediti primerjalno analizo klasičnega hierarhičnega planiranja MRP proizvodnje in sodobnega planiranja DDOM (Demand driven operating model). Metode in orodja: Raziskovali smo literaturo s področja hierarhičnega planiranja MRP proizvodnje in planiranja DDOM. Analizirali smo gradiva o izobraževanju planiranja proizvodnje GlobalBikelnc v SAP/R3 in SAP4HANA. Primerjali smo orodji SAP/R3 in SAP4HANA ter naredili primerjalno analizo aktivnosti in ukazov za izvedbo izobraževanja med SAP/R3 in SAP4HANA. Naredili smo tudi primerjalno analizo klasičnega planiranja in planiranja DDOM. Rezultat diplomskega dela: Klasičen sistem planiranja proizvodnje, v literaturi prepoznan tudi kot model hierahičnega planiranja proizvodnje ali MRP II (Manufacturing resource planning) ali koncept MRP/CRP (Material / Capacity requirements planning) ali klasični MRP, nam ne omogoča optimalnega planiranja in natančnega pregleda zalog, ker modul MRP ne upošteva operacij, ki so v teku. Pri klasičnem planiranju MRP naročila niso zaključena ob pravem času, kajti pretok informacij in podatkov je prepočasen.
Keywords:primerjalna analiza, oskrbovalna veriga, informacijska tehnologija, programska oprema, DDOM.
Place of publishing:Maribor
Year of publishing:2021
PID:20.500.12556/DKUM-79937 New window
COBISS.SI-ID:77230851 New window
Publication date in DKUM:21.09.2021
Views:1864
Downloads:47
Metadata:XML DC-XML DC-RDF
Categories:FOV
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share


Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Licences

License:CC BY-NC-ND 4.0, Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International
Link:http://creativecommons.org/licenses/by-nc-nd/4.0/
Description:The most restrictive Creative Commons license. This only allows people to download and share the work for no commercial gain and for no other purposes.
Licensing start date:23.08.2021

Secondary language

Language:English
Title:Comparative analysis of ddom and hierarchical concept of production planning
Abstract:Problem: The classical production planning system, also recognized in the literature as a model of hierarchical production planning or MRP II (Manufacturing resource planning) or the concept of MRP / CRP (Material / Capacity requirements planning) or classical MRP, does not allow us optimal planning and accurate inventory review because MRP the module does not take into account ongoing operations. In classic MRP planning, orders are not completed at the right time because the flow of information and data is too slow. Purpose: The purpose of the thesis is to make a comparative analysis of the classic hierarchical MRP production planning and modern DDOM (Demand driven operating model) planning. Methods and tools: Research of literature in the field of hierarchical MRP production planning and DDOM planning. Analysis of materials on GlobalBikelnc production planning education in SAP / R3 and SAP4HANA. We compared SAP / R3 and SAP4HANA tools and made a comparative analysis of activities and commands for conducting training between SAP / R3 and SAP4HANA. We also performed a comparative analysis of classical planning and DDOM planning. Thesis result: In the comparative analysis, we found out what the new functionalities are in modern planning and we found that it is a classic planning only with advanced additions. Based on the analysis of the current situation, the advantages of the SAP4HANA tool and the improvements brought by its introduction are also shown. The most noticeable improvement of the tool is the program structure. We found that the GBI HANA is made according to classic planning.
Keywords:Benchmarking, supply chain, information technology, software, DDOM.


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica