Title: | Model for optimal project portfolio for the construction of railway infrastructure on corridors V and X |
---|
Authors: | ID Hauc, Anton (Author) ID Bastič, Majda (Author) ID Jurše, Lidia (Author) ID Pšunder, Mirko (Author) |
Files: | PROMET_2010_Hauc_et_al._Model_for_Optimal_Project_Portfolio_for_the_Construction_of_Railway_Infrastructure_on_Corridors_V_and_X.pdf (322,18 KB) MD5: 5898FB05B28D44FE23B7B403317AAA28
http://www.fpz.unizg.hr/traffic/index.php/PROMTT/article/view/162
|
---|
Language: | English |
---|
Work type: | Scientific work |
---|
Typology: | 1.03 - Other scientific articles |
---|
Organization: | EPF - Faculty of Business and Economics
|
---|
Abstract: | The construction of railway infrastructure should be dealt with as a national strategic developmental programme, which due to technical, geographical, logistical, and other requirements is carried out through a number of projects and represents a complex multiple project operation for investors, contractors, and other influential players. The national strategic developmental programme for the construction of the railway infrastructure is connected through programmes in neighbouring countries and EU member states to Trans-European Networks (TEN) that strategically regulate construction within the community. In the Republic of Slovenia, the construction of railway infrastructure within TEN programmes is carried out on the pan-European traffic corridors V and X within individual projects for the construction of sections and a number of supporting projects. Technical requirements, deadlines, and other TEN requirements as well as national strategic requirements and financial possibilities of the state represent basic criteria that should be taken into consideration in setting up a strategic project plan, with optimal project classification achieved through the implementation project portfolio. The current article utilised the method of multiple-criteria decision analysis to prepare the portfolio, taking into account macroeconomic and infrastructural criteria. Consequently, the results represent the basis for the preparation of an optimal financial plan with regard to financing possibilities of the Republic of Slovenia and the European Union. The article also summarised the research results regarding the formation of the project implementation process of the TEN-T network construction in the Republic of Slovenia. |
---|
Keywords: | national strategic development, railway infrastructure construction, railway corridors V and X, project portfolio, multiple-criteria decision analysis, Republic of Slovenia |
---|
Publication status: | Published |
---|
Publication version: | Version of Record |
---|
Year of publishing: | 2010 |
---|
Number of pages: | str. 29-41 |
---|
Numbering: | Letn. 22, št. 1 |
---|
PID: | 20.500.12556/DKUM-66017  |
---|
ISSN: | 0353-5320 |
---|
UDC: | 656.2:33 |
---|
ISSN on article: | 0353-5320 |
---|
COBISS.SI-ID: | 13949462  |
---|
DOI: | 10.7307/ptt.v22i1.162  |
---|
NUK URN: | URN:SI:UM:DK:WMBB5FWI |
---|
Publication date in DKUM: | 05.06.2017 |
---|
Views: | 1662 |
---|
Downloads: | 437 |
---|
Metadata: |  |
---|
Categories: | Misc.
|
---|
:
|
Copy citation |
---|
| | | Average score: | (0 votes) |
---|
Your score: | Voting is allowed only for logged in users. |
---|
Share: |  |
---|
Hover the mouse pointer over a document title to show the abstract or click
on the title to get all document metadata. |