| | SLO | ENG | Piškotki in zasebnost

Večja pisava | Manjša pisava

Izpis gradiva Pomoč

Naslov:MREŽNO PLANIRANJE NA PRIMERU IZGRADNJE KOMUNALNE KANALIZACIJE S ČISTILNO NAPRAVO
Avtorji:ID Gomboc, Danijela (Avtor)
ID Pažek, Karmen (Mentor) Več o mentorju... Novo okno
Datoteke:.pdf VS_Gomboc_Danijela_2013.pdf (5,35 MB)
MD5: 4072D1A5B8C2448C320E28DF1C59B38C
PID: 20.500.12556/dkum/2dc0fa87-1614-4eb3-b9cf-ee2386858941
 
Jezik:Slovenski jezik
Vrsta gradiva:Diplomsko delo
Organizacija:FKBV - Fakulteta za kmetijstvo in biosistemske vede
Opis:Diplomsko delo temelji na uporabi metod mrežnega planiranja na primeru izgradnje komunalne kanalizacije s čistilno napravo. Postopek mrežnega planiranja je opisan in prikazan s pomočjo dveh metod mrežnega planiranja, in sicer CPM metode in PERT metode. S pomočjo obeh metod bo prikazano organizirano načrtovanje in definiranje časovnega zaporedja dejavnosti ter medsebojna povezava med dejavnostmi. Pri CPM metodi bodo prikazani podatki o najzgodnejših in najpoznejših rokih dogodkov. Pri nekaterih dogodkih se je pokazalo, da sta najzgodnejši in najpoznejši rok enaka, kar pomeni, da gre za kritično pot. Ta je v našem primeru dolga 562 dni. Rezultati PERT metode kažejo, da je pričakovani čas projekta 563,16 dni. Na podlagi ocen optimističnega (555 dni), pesimističnega (576 dni) in najverjetnejšega (562 dni) časa, lahko z 68 % verjetnostjo trdimo, da se bo, ob vseh predpostavkah, zastavljeni projekt izgradnje kanalizacije s čistilno napravo resnično izvedel v času med 559,66 in 566,66 dni. S 95% verjetnostjo lahko trdimo, da se bo izvedel v času med 556,16 in 570,16 dni in z 99,9 % verjetnostjo se bo izvedel med 552,66 in 573,66 dni.
Ključne besede:mrežni plan, gantogram, čistilna naprava, CPM, PERT
Kraj izida:Maribor
Leto izida:2013
PID:20.500.12556/DKUM-39588 Novo okno
NUK URN:URN:SI:UM:DK:MDZUMWP9
Datum objave v DKUM:26.02.2013
Število ogledov:2508
Število prenosov:330
Metapodatki:XML DC-XML DC-RDF
Področja:FKBV
:
Kopiraj citat
  
Skupna ocena:(0 glasov)
Vaša ocena:Ocenjevanje je dovoljeno samo prijavljenim uporabnikom.
Objavi na:Bookmark and Share


Postavite miškin kazalec na naslov za izpis povzetka. Klik na naslov izpiše podrobnosti ali sproži prenos.

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Network planning applied to the construction of a communal sewer system with a treatment facility
Opis:The diploma is based upon the use of network planning methods applied to the construction of a communal sewer system with a treatment facility. The process of network planning is described and presented using two methods of network planning – the CPM method and the PERT method. Both methods will be used to present the organized planning and determining the schedule of the activities as well as the correlation between these activities. The CPM method will be used to show data about the earliest and latest deadlines for the activities. The earliest and latest deadlines of some activities have been revealed as equal, which implies a critical path with a timeline of 562 days. The results of the PERT method indicate an expected duration of the project at 563.16 days. Based on optimistic (555 days), pessimistic (576 days) and the likeliest (562 days) duration evaluations and assuming all suppositions, we can say with a likelihood of 68 % that the proposed project of the construction of a communal sewer system with a treatment facility will be carried out between 559.66 and 566.66 days. With a likelihood of 95 % we can say it will be carried out in 556.16 to 570.16 days, and with a 99.9 % likelihood the duration is expected to lie between 552.66 and 573.66 days.
Ključne besede:network plan, Gantt chart, treatment facility, CPM method, PERT method


Komentarji

Dodaj komentar

Za komentiranje se morate prijaviti.

Komentarji (0)
0 - 0 / 0
 
Ni komentarjev!

Nazaj
Logotipi partnerjev Univerza v Mariboru Univerza v Ljubljani Univerza na Primorskem Univerza v Novi Gorici