| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Show document Help

Title:DOLOČITEV PARAMETROV ZA IZBIRO NOVEGA TRANSFORMATORJA V NEK
Authors:ID Knez, Tomaž (Author)
ID Virtič, Peter (Mentor) More about this mentor... New window
ID Dirnbek, Vladimir (Comentor)
Files:.pdf UNI_Knez_Tomaz_2012.pdf (9,40 MB)
MD5: EA50B03AE01B23263A52BE0DB8DBDD11
PID: 20.500.12556/dkum/a2e7280d-c4be-48c0-a168-875e91228ab1
 
Language:Slovenian
Work type:Bachelor thesis/paper
Typology:2.11 - Undergraduate Thesis
Organization:FE - Faculty of Energy Technology
Abstract:Predmet diplomskega dela je analiza stanja glavnih transformatorjev v Nuklearni elektrarni Krško, ki sta ozko grlo pri prenosu električne energije. Potrebno je določiti parametre novega transformatorja. Potrdila se je pravilnost prehoda na večje enote, saj se je z uspešnimi zamenjavami uparjalnikov, nizkotlačnih turbin in sekundarnih grelnikov povečala delovna moč generatorja iz 650 MW na 730 MW, dovoljuje pa se tudi še dodatna povečanja kapacitet ob dodatnih bodočih tehnoloških izboljšavah. V letu 2012 se je zamenjal še rotor generatorja, z izboljšavami na področju izkoristkov pa se lahko izboljša še moč elektrarne do parametrov, ki jih novi generator dopušča.
Keywords:transformator, stikališče, porazdelitev moči in izgub, Nuklearna elektrarna Krško
Place of publishing:Krško
Publisher:[T. Knez]
Year of publishing:2012
PID:20.500.12556/DKUM-38759 New window
UDC:621.314:621.319(043.2)
COBISS.SI-ID:1024104796 New window
NUK URN:URN:SI:UM:DK:ZY4BCDA2
Publication date in DKUM:06.11.2012
Views:1799
Downloads:340
Metadata:XML DC-XML DC-RDF
Categories:FE
:
Copy citation
  
Average score:(0 votes)
Your score:Voting is allowed only for logged in users.
Share:Bookmark and Share


Hover the mouse pointer over a document title to show the abstract or click on the title to get all document metadata.

Secondary language

Language:English
Title:DETERMINATION OF PARAMETERS FOR THE SELECTION OF A NEW TRANSFORMER IN THE NPP KRŠKO
Abstract:Master’s thesis analyses the situation of the main transformers in Krško Nuclear Power Plant, which are a bottleneck in the transmission of electrical energy. It is necessary to determine the parameters of the new transformer. It was confirmed the correct choise of the transition to larger units. Power generation was increased from 650 MW to 730 MW due to the successful replacement of the steam generators, low pressure steam turbines and secondary heaters. Larger unit also allows a further increase in capacity with additional future technological improvements. In 2012 the rotor of of the generator was replaced and the power plant with further improvements in efficiency can be improved up to parameters allowed by the new generator.
Keywords:transformer, switchyard, distribution of power and losses, Krško Nuclear Power Plant


Comments

Leave comment

You must log in to leave a comment.

Comments (0)
0 - 0 / 0
 
There are no comments!

Back
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica