Naslov:Cost estimation, optimization and competitiveness of different composite floor systems
Avtorji:ID Klanšek, Uroš (Avtor)
ID Kravanja, Stojan (Avtor)
Datoteke:URL http://dx.doi.org/10.1016/j.jcsr.2005.08.005
 
Jezik:Angleški jezik
Vrsta gradiva:Neznano
Tipologija:1.01 - Izvirni znanstveni članek
Organizacija:FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
Opis:This paper presents self-manufacturing cost estimation, cost optimization and competitiveness of different composite floor systems: composite I beams, composite trusses produced from rolled channel sections and composite trusses made from cold formed hollow sections. Part 1 of this two-part series of papers presents the estimation of the self-manufacturing (direct production) costs for composite and steel structures. The self-manufacturing costs are proposed to be defined as the sum of the material, the power consumption and the labour costs. The material costs of the structural steel, concrete, reinforcement, the shear connectors, electrodes, the anti-corrosion, fire protection and top coat painting, the formwork floor-slab panels and gas consumption are presented in detail. The power consumption costs comprise costs of sawing the steel sections, edge grinding, drilling, welding, stud welding and vibrating the concrete. The labour costs (times) presented define the costs of metal cutting, edge grinding, preparation, assembling and tacking, welding, welding of shear connectors, steel surface preparation and protection, drilling, cutting, placing and connecting the reinforcement, concreting, consolidating and curing the concrete. New approximation functions are proposed for the calculation of some manufacturing times and material consumptions. As the discussed costs vary significantly around the world, the proposed cost expressions are given in the open form to be used for cost estimation in different economic conditions. A numerical example of the estimation of the self-manufacturing costs for a composite I beam floor system shows the suitability of the proposed approach. On the basis of the defined self-manufacturing costs, introduced in Part 1, the cost optimization and the competitiveness of different composite floor systems are discussed in Part 2.
Ključne besede:cost estimation, self-manufacturing costs, material costs, power consumption costs, labour costs, steel structures, composite structures, welded structures
Leto izida:2006
PID:20.500.12556/DKUM-25655 Novo okno
UDK:624.074:657.47
COBISS.SI-ID:9830166 Novo okno
ISSN pri članku:0143-974X
NUK URN:URN:SI:UM:DK:D5Q75R0L
Datum objave v DKUM:30.05.2012
Število ogledov:2438
Število prenosov:33
Metapodatki:XML DC-XML DC-RDF
Področja:Ostalo
:
Kopiraj citat
  
Skupna ocena:(0 glasov)
Vaša ocena:Ocenjevanje je dovoljeno samo prijavljenim uporabnikom.
Objavi na:Bookmark and Share


Postavite miškin kazalec na naslov za izpis povzetka. Klik na naslov izpiše podrobnosti ali sproži prenos.

Gradivo je del revije

Naslov:Journal of Constructional Steel Research
Skrajšan naslov:J. Constr. steel res.
Založnik:Elsevier
ISSN:0143-974X
COBISS.SI-ID:1326341 Novo okno

Sekundarni jezik

Jezik:Angleški jezik
Naslov:Cost estimation, optimization and competitiveness of different composite floorsystems-Part 1: Self-manufacturing cost estimation of composite and steelstructures


Komentarji

Dodaj komentar

Za komentiranje se morate prijaviti.

Komentarji (0)
0 - 0 / 0
 
Ni komentarjev!

Nazaj
Logotipi partnerjev Univerza v Mariboru Univerza v Ljubljani Univerza na Primorskem Univerza v Novi Gorici