| | SLO | ENG | Piškotki in zasebnost

Večja pisava | Manjša pisava

Iskanje po katalogu digitalne knjižnice Pomoč

Iskalni niz: išči po
išči po
išči po
išči po
* po starem in bolonjskem študiju

Opcije:
  Ponastavi


1 - 3 / 3
Na začetekNa prejšnjo stran1Na naslednjo stranNa konec
1.
Active BIM system for optimized multi-project ready-mix-concrete delivery
Hana Begić, Mario Galić, Uroš Klanšek, 2024, izvirni znanstveni članek

Opis: Purpose – Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery. Design/methodology/approach – The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures. Findings – The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants. Originality/value – The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.
Ključne besede: active building information modeling, BIM, internet of things, IoT, multi-project environment, optimization, ready-mix-concrete delivery, RMC
Objavljeno v DKUM: 11.09.2024; Ogledov: 32; Prenosov: 11
.pdf Celotno besedilo (3,94 MB)
Gradivo ima več datotek! Več...

2.
Survey of accomplishments in BIM implementation in Croatia, the Czech Republic, Germany, and Slovenia
Mario Galić, Vaclav Venkrbec, Franziska Chmelik, Immo Feine, Zoran Pučko, Uroš Klanšek, 2017, izvirni znanstveni članek

Opis: Building information modelling (BIM) may currently be considered the fastest developing concept in the field of construction management, aiming to become a global standard. Although the roots of the concept date back to the mid-1970s, some original expectations are still missing from its implementation. There has been a time gap between its theoretical and practical implementations. While the simultaneous development of information technologies is one reason for the implementation delay, other reasons remain unclear. This paper analyzes the gaps between theoretical and practical BIM application, as well as the legislation regarding BIM implementation in four countries (in alphabetical order: Croatia, the Czech Republic, Germany, and Slovenia). The paper additionally presents a survey of current practical BIM applications as well as general and theoretical feedback from construction projects that implemented BIM.
Ključne besede: construction industry, implementation, project management, survey
Objavljeno v DKUM: 12.01.2018; Ogledov: 1526; Prenosov: 366
.pdf Celotno besedilo (694,12 KB)
Gradivo ima več datotek! Več...

3.
Application of "Einstein's riddle" in solving construction machine allocation problems
Borna Dasović, Marko Čorak, Mario Galić, Uroš Klanšek, 2016, izvirni znanstveni članek

Opis: “Einstein’s riddle” is a popular example of constraints satisfaction problem. Since its introduction, different forms and variations of the riddle have been presented. Regardless of the variant of the riddle, its solution is considered a tough challenge for humans. Researchers have developed and are still developing mathematical models, as well as computational simulation models for solving it. In this article, the authors have modified a previously published mathematical model and developed a computational spreadsheet model for solving the riddle, which provides a unique solution for the riddle. The model was also tested in a small and medium-scaled form for solving constraint satisfaction problems regarding the allocation of construction machines. The authors have also highlighted the model’s limitations for solving such problems and made suggestions regarding necessary modifications in the model to solve more complex problems in the same domain.
Ključne besede: Einstein's riddle, zebra riddle, construction, machine allocation, combinatorial optimization
Objavljeno v DKUM: 02.08.2017; Ogledov: 1282; Prenosov: 429
.pdf Celotno besedilo (437,45 KB)
Gradivo ima več datotek! Več...

Iskanje izvedeno v 0.07 sek.
Na vrh
Logotipi partnerjev Univerza v Mariboru Univerza v Ljubljani Univerza na Primorskem Univerza v Novi Gorici