Abstract: This paper deals with critical flow regimes that may induce an unacceptable water hammer in the Sava River Kaplan turbine hydropower plants. The rigid water hammer model is introduced first. The computational results are then compared with the results of measurements in two distinct hydropower plants (HPP): (i) The refurbished and upgraded Medvode HPP, and (ii) The newest Brežice HPP. Comparisons of the computed and measured results are examined for normal operating regimes. The water hammer in the two power plants is controlled by appropriate adjustment of the wicket gates and runner blades closing/opening manoeuvres. The agreement between the computed and measured results is reasonable.Keywords: hydropower plant, Kaplan turbine, Sava River, water hammer, validationPublished in DKUM: 11.04.2025; Views: 0; Downloads: 35 Full text (880,22 KB)This document has many files! More...
Keywords: water hammer, shut-off valve, hydropower plantPublished in DKUM: 05.06.2012; Views: 2363; Downloads: 70 Link to full text