| | SLO | ENG | Cookies and privacy

Bigger font | Smaller font

Search the digital library catalog Help

Query: search in
search in
search in
search in
* old and bologna study programme

Options:
  Reset


1 - 10 / 85
First pagePrevious page123456789Next pageLast page
1.
2.
Active BIM system for optimized multi-project ready-mix-concrete delivery
Hana Begić, Mario Galić, Uroš Klanšek, 2023, original scientific article

Abstract: Purpose – Ready-mix concrete delivery problem (RMCDP), a specific version of the vehicle routing problem (VRP), is a relevant supply-chain engineering task for construction management with various formulations and solving methods. This problem can range from a simple scenario involving one source, one material and one destination to a more challenging and complex case involving multiple sources, multiple materials and multiple destinations. This paper presents an Internet of Things (IoT)-supported active building information modeling (BIM) system for optimized multi-project ready-mix concrete (RMC) delivery. Design/methodology/approach – The presented system is BIM-based, IoT supported, dynamic and automatic input/output exchange to provide an optimal delivery program for multi-project ready-mix-concrete problem. The input parameters are extracted as real-time map-supported IoT data and transferred to the system via an application programming interface (API) into a mixed-integer linear programming (MILP) optimization model developed to perform the optimization. The obtained optimization results are further integrated into BIM by conventional project management tools. To demonstrate the features of the suggested system, an RMCDP example was applied to solve that included four building sites, seven eligible concrete plants and three necessary RMC mixtures. Findings – The system provides the optimum delivery schedule for multiple RMCs to multiple construction sites, as well as the optimum RMC quantities to be delivered, the quantities from each concrete plant that must be supplied, the best delivery routes, the optimum execution times for each construction site, and the total minimal costs, while also assuring the dynamic transfer of the optimized results back into the portfolio of multiple BIM projects. The system can generate as many solutions as needed by updating the real-time input parameters in terms of change of the routes, unit prices and availability of concrete plants. Originality/value – The suggested system allows dynamic adjustments during the optimization process, andis adaptable to changes in input data also considering the real-time input data. The system is based on spreadsheets, which are widely used and common tool that most stakeholders already utilize daily, while also providing the possibility to apply a more specialized tool. Based on this, the RMCDP can be solved using both conventional and advanced optimization software, enabling the system to handle even large-scale tasks as necessary.
Keywords: active building information modeling, BIM, internet of things, IoT, multi-project environment, optimization, ready-mix-concrete delivery, RMC
Published in DKUM: 11.09.2024; Views: 32; Downloads: 0

3.
Organizacija gradbišča in terminsko planiranje rekonstrukcije objekta generator v Celju : diplomsko delo
Ksenija Verbič, 2023, undergraduate thesis

Abstract: V diplomskem delu sta predstavljena organizacija gradbišča in terminsko planiranje rekonstrukcije objekta Generator v Celju. V uvodnem delu so opisani problem, namen in cilj diplomskega dela. Sledi splošni del, v katerem je podan opis lokacije, funkcionalne zasnove in tehničnih značilnosti novega objekta. V glavnem delu diplomske naloge smo proučili pogoje za gradnjo, kar zajema naslednje vsebine: lokacijska informacija, gradbena pogodba, delovna sredstva, gradbeno dovoljenje, možnost nabave materiala in organizacija na sami lokaciji gradbišča. V nadaljevanju je predstavljena organizacija gradbišča, kjer so opisani gradbišče, dimenzioniranje deponij, začasni objekti in začasne inštalacije ter izdelava sheme organizacije gradbišča. V zaključnem delu je prikazano terminsko planiranje objekta v obliki modificiranega gantograma in mrežnega diagrama.
Keywords: gradbeništvo, organizacija gradbišča, terminsko planiranje
Published in DKUM: 19.12.2023; Views: 547; Downloads: 61
.pdf Full text (4,24 MB)

4.
Optimal positioning of mobile cranes on construction sites using nonlinear programming with discontinuous derivatives
Matjaž Hozjan, Uroš Klanšek, 2023, original scientific article

Abstract: Mobile cranes represent conventional construction machinery that is indispensable for the erection of most prefabricated buildings, especially those containing heavy components. However, it is also common knowledge that the engagement of these machines has a significant influence on the environment, various social aspects of the construction process, and its economic benefits. Optimal positioning of the mobile crane on the construction site, primarily driven by the contractor’s interest to perform assembly operations with expensive machinery as effectively as possible, considerably reduces not only the costs of engaging such a machine but indirectly also its negative impacts on construction sustainability. This paper discusses an exact nonlinear model for the optimization task. The optimization model consists of a cost objective function that is subject to various duration and positioning constraints for the mobile crane, including bounds on its degrees of freedom of movement and stop positions. Because the model formulation includes discontinuous and non-smooth expressions, nonlinear programming with discontinuous derivatives (DNLP) was employed to ensure the optimal solution was reached. The model provides the mobile crane operator with exact key information that enables the complete and optimal assembly of the building structure under consideration. Additionally, the information gained on the optimal distribution of the mobile crane rental period to assembly operations allows for a detailed duration analysis of the entire process of building structure erection, which can be used for its further improvement. An application example is given in this study to demonstrate the advantages of the proposed approach.
Keywords: construction sustainability, mobile crane, nonlinear programming with discontinuous derivatives, optimization, positioning
Published in DKUM: 18.12.2023; Views: 403; Downloads: 14
.pdf File (877,26 KB)
This document has many files! More...

5.
Organizacija gradbišča in terminsko planiranje gradnje hotela A v Žalcu : diplomsko delo
Jan Knez, 2023, undergraduate thesis

Abstract: V diplomskem delu je obravnavana organizacija gradbišča in terminsko planiranje Hotela A v Žalcu. Najprej je predstavljen splošni opis objekta (lokacija, funkcionalna zasnova, velikost in tlaki prostorov v posameznih nadstropjih idr.). Sledi opis konstrukcije in njena obdelava, kakšni materiali bodo vgrajeni in njihove dimenzije. Zajeti so tudi komunali priključki in kako jih pravilno izvesti. Organizacija gradbišča se prične s predhodnim proučevanjem pogojev gradnje objekta. Prikazane so dolžnosti investitorja in izvajalca, proučevanje lokacijske informacije, vplivov objekta na okolico in preskrba gradbišča s potrebnimi materiali. Predstavljeni so tudi tehnološki procesi grajenja za predvideni projekt, ureditev gradbišča, dimenzioniranje in postavitev začasnih objektov ter začasnih priključkov, ki so potrebni za normalno obratovanje gradbišča. Zadnji del zajema terminsko planiranje, kjer so prikazane logično in racionalno razporejene aktivnosti na gradbišču. Opisane so aktivnosti, ki se bodo izvajale v fazi gradnje objekta in so prikazane v gantogramu, kjer so razvidni začetek, konec in dolžina trajanja posamezne aktivnosti ter medsebojne povezave. Na koncu bomo dobili skupno število dni, potrebnih od začetka do končanja vseh del na objektu, ki morajo biti izvedena v pogodbenem roku.
Keywords: gradbeništvo, organizacija gradbišča, terminsko planiranje
Published in DKUM: 02.11.2023; Views: 577; Downloads: 69
.pdf Full text (2,13 MB)
This document has many files! More...

6.
A review of energy-efficient and sustainable construction scheduling supported with optimization tools
Borna Dasović, Uroš Klanšek, 2022, review article

Abstract: This article reviews the accomplishments of studies in which optimization tools were used to develop energy-efficient and sustainable construction schedules. With the increase in global awareness of environmental issues, the construction industry has been forced to explore innovative techniques to make the building process more energy-efficient and sustainable. Project managers can use optimization tools in their scheduling procedures to address these issues in the early stages of the project. Therefore, this paper examines different optimization-based construction scheduling methods and their impact on schedule energy efficiency and the three key sustainability goals: economic viability, social equity, and environmental protection. Such a review has not yet been conducted to the best of our knowledge. This research aims to fill the gap and contribute to understanding advanced optimization tools that can pave the way to energy-efficient and sustainable scheduling practices. After a brief introduction, the background of optimization-based construction scheduling techniques that aim to improve construction management and incorporate these aspects into the decision-making process is explained. Then, these approaches are addressed in detail. It is determined for each study whether it adopted energy efficiency goals and which sustainability dimensions it considered within the proposed optimization model. The results of this study indicate a wide heuristic algorithms application for complex scheduling problems. Meanwhile, mathematical programming is still quite unexplored, especially methods that utilize algebraic modeling languages. This study provides a foundation for further research by addressing the current reach in development and possible knowledge gaps that could be researched in future studies. The paper also discusses the advantages and limitations of different approaches and illustrates the potential for utilizing these methods. Supported by the main review findings, conclusions and recommendations for further research are provided.
Keywords: construction, project management, optimization tools, scheduling, sustainability, energy efficiency
Published in DKUM: 26.09.2023; Views: 393; Downloads: 20
.pdf Full text (1,20 MB)
This document has many files! More...

7.
Tehnološki proces grajenja in terminsko planiranje rekonstrukcije ceste Zg. Ščavnica - Dražen vrh : diplomsko delo
Dani Milošič, 2022, undergraduate thesis

Abstract: V diplomskem delu je opis tehnološkega procesa grajenja in terminskega planiranja objekta ureditev ceste Sveta Ana R3-730/4105. Na začetku diplomskega dela je uvod, v katerem je opis problematike ceste, namen in cilj diplomske naloge. V drugem delu diplomske naloge je splošni del, ki zajema podatke o projektu, podatke o vseh udeležencih, ki so prisotni pri izgradnji objekta, rok gradnje, zapora ceste ter predstavitev projektne dokumentacije. Nato sledi opis objekta, v katerem je predstavljeno obstoječe stanje, potek rekonstrukcije ceste, oporni zid, most čez Ščavnico, odvodnjavanje, prometna oprema in signalizacija. V nadaljevanju sledi preučitev pogojev za gradnjo, kjer se bo preučila dokumentacija objekta, geološko geomehanske razmere, klimatsko meteorološke razmere, možnost pridobivanja surovin ter nabava materiala, prometne razmere in preučitev gradbene pogodbe. Nato sledi poglavje tehnološki proces grajenja, kjer so predstavljeni tehnološki procesi grajenja, ki opisujejo potek gradnje in uporaba tehnologij pri gradnji. Na koncu diplomskega dela je opis poteka grajenja, ki zajema opis vrstnega reda aktivnosti, analizo časa posamičnih aktivnosti, predstavitev terminskega plana in izdelan dinamični plan delovne sile.
Keywords: gradbeništvo, rekonstrukcija, tehnologija grajenja, terminsko planiranje.
Published in DKUM: 27.10.2022; Views: 771; Downloads: 72
.pdf Full text (29,46 MB)

8.
Organizacija gradbišča in tehnološki procesi vodnogospodarske ureditve v občini Šentilj : diplomsko delo
Ammar Šiljić, 2022, undergraduate thesis

Abstract: V diplomski nalogi so predstavljeni organizacija gradbišča in tehnološki procesi vodnogospodarske ureditve v občini Šentilj v Slovenskih goricah v sklopu projekta Ureditev križanj cest z železnico na odseku železniške proge Pesnica-Šentilj-državna meja. V prvem delu so predstavljeni osnovni projektni podatki, kot so lokacija izvedbe vodnogospodarske ureditve, namen izvedbe omenjenega projekta ter proučitev pogojev za izgradnjo. V nadaljevanju diplomskega dela se osredotočimo na organizacijo gradbišča s tehničnim poročilom, v katerem so opisani dostop do gradbišča, komunalni priključki, začasni objekti, deponije, potrebna delovna sila in delovna sredstva ter varnost in zdravje pri delu. V zadnjem delu so opisani tehnološki procesi izvedbe vodnogospodarske ureditve ter materiali, ki se uporabljajo pri gradnji. Zaključni del naloge prikazuje situacijo organizacije gradbišča.
Keywords: gradbeništvo, organizacija gradbišča, gradbena dela, tehnološki procesi grajenja
Published in DKUM: 25.08.2022; Views: 892; Downloads: 83
.pdf Full text (11,58 MB)

9.
Organizacija gradbišča in terminsko planiranje gradnje prizidka Vrtca Ciciban Sevnica : diplomsko delo
Janko Relič, 2022, undergraduate thesis

Abstract: Diplomsko delo predstavlja organizacijo gradbišča in terminsko planiranje gradnje prizidka vrtca Ciciban Sevnica. V uvodnem delu so opisani problem, namen in cilj diplomskega dela. Sledi splošni del, v katerem so predstavljeni podatki o projektu, seznam udeležencev, rok gradnje in projektna dokumentacija. V glavnem delu diplomske naloge smo proučili pogoje za gradnjo. Obravnavane vsebine so lokacijska informacija, gradbena pogodba, delovna sredstva, gradbena dovoljenja, možnost nabave materiala in organizacija na sami lokaciji gradbišča. Nadaljujemo z obravnavo organizacije gradbišča, kar pomeni opis gradbišča, dimenzioniranje deponij in začasnih objektov, začasnih instalacij in izdelavo sheme organizacije gradbišča. V zaključku diplomskega dela pa predstavimo operativno planiranje s pomočjo kombinacije gantogramske tehnike in mrežne tehnike terminskega planiranja, katerih rezultat je modificirani gantogram in mrežni diagram.
Keywords: gradbeništvo, organizacija gradbišča, terminsko planiranje
Published in DKUM: 02.03.2022; Views: 1054; Downloads: 139
.pdf Full text (5,67 MB)

10.
ORGANIZACIJA GRADBIŠČA IN TEHNOLOŠKI PROCESI GRADNJE BENCINSKEGA SERVISA V CELJU : diplomsko delo
Jan Škrablin, 2021, undergraduate thesis

Abstract: V diplomski nalogi so predstavljeni organizacija gradbišča ter tehnološki procesi rekonstrukcije in novogradnje obstoječega bencinskega servisa Celje. Prvi del naloge prikazuje splošne podatke o projektu, predvideni investiciji, prav tako pa tudi opiše obstoječe stanje in nakazuje na predvideno novo stanje objekta. V nadaljevanju sledi proučevanje pogojev za gradnjo objekta, in sicer se posveča proučevanju projektne dokumentacije, gradbene pogodbe, lokacijskih zmožnosti, klimatskih razmer in razpoložljivosti internih virov podjetja. Jedro diplomskega dela predstavlja organizacija gradbišča, ki obsega dimenzioniranje vseh začasnih prostorov, deponij gradbenega materiala in opreme, priključitev na komunalno oskrbo in opise notranjih ter zunanjih transportov. Zadnji del naloge opisuje procese rekonstrukcije in novogradnje objekta, kjer so natančno opisani vsi postopki gradnje, ki jih izvedemo, da zagotovimo optimalno opravljeno delo. V zaključku je prikazan načrt organizacije gradbišča.
Keywords: gradbeništvo, gradbena dela, organizacija gradbišča, dokumentacija, tehnološki procesi gradnje
Published in DKUM: 15.09.2021; Views: 1281; Downloads: 166
.pdf Full text (5,22 MB)

Search done in 0.31 sec.
Back to top
Logos of partners University of Maribor University of Ljubljana University of Primorska University of Nova Gorica